Quick Checks
Short mobile-friendly forms with Yes, No, Not sure and N/A answers. Progress saves in the browser and the result can be printed or saved as a PDF.
Browse Quick ChecksUse a 5–10 minute Quick Check for a first walk-around, or open the detailed engineering checklist when you need evidence, escalation triggers and a traceable working record.
Use checks to choose the pathway, calculators to screen the number, and checklists to verify evidence and gaps before the job file is closed.
The workflow is a guide to using AS Applied tools, not a project approval sequence.
Short mobile-friendly forms with Yes, No, Not sure and N/A answers. Progress saves in the browser and the result can be printed or saved as a PDF.
Browse Quick ChecksLonger working checklists that explain evidence to collect, typical gaps, escalation triggers, source basis and useful attachment packs.
View detailed checklistsEach form asks only the first questions needed to expose obvious gaps and uncertain items.
A short site check for obvious ladder, landing, gate, handrail and fall-protection gaps.
Start quick check →02A short check for obvious guarding, interlock, emergency-stop and modification-management gaps.
Start quick check →03A short asset-owner check for identification, inspection status, corrosion evidence, relief protection and document gaps.
Start quick check →04A short check for inspection status, duty-life triggers, safety devices, structure and wire-rope condition.
Start quick check →These longer working records are intentionally more detailed. A tick means the item has been reviewed—not that the asset has been certified compliant.
Review fixed ladders, landings and platforms for geometry, transition safety, fall protection, guarding, dropped-object controls and condition evidence.
Open detailed checklist →02Check whether the installed machine, guarding, interlocks, emergency stops, safety distances and modification history are supported by a current risk-assessment and validation record.
Open detailed checklist →03Review inspection planning, competent-person basis, external/internal examinations, thickness monitoring, corrosion rate, safeguarding devices and lifecycle records for pressure equipment.
Open detailed checklist →04Review crane inspection tiers, duty history, design working period, major-inspection triggers, wire rope examination and defect close-out without relying on a generic 10-year rule.
Open detailed checklist →05Gather the engineering information needed before a plant change is designed, approved or sent out for quotation.
Open detailed checklist →06Capture the condition, evidence, operating history and immediate controls needed for a useful engineering assessment.
Open detailed checklist →07Send a focused technical request that gives the manufacturer enough context to provide a useful, traceable response.
Open detailed checklist →08Track the assessment, design, fabrication, inspection, testing and close-out records needed for a defensible repair package.
Open detailed checklist →