Can the equipment be uniquely identified and is the nameplate readable?
What should I look for?
Record asset number, manufacturer, serial number and any registration identifier.
A short asset-owner check for identification, inspection status, corrosion evidence, relief protection and document gaps.
Use this as a first-pass record for a pressure vessel or similar item. It helps expose overdue inspections, missing design information and uncertain wall-loss decisions before a detailed competent-person review.
0 of 14 questions reviewed.
Record asset number, manufacturer, serial number and any registration identifier.
Do not rely only on current operating pressure if the approved design basis is missing.
Record the actual basis rather than assuming an item is exempt because it is small or old.
Check the last date, next due date, scope and any open findings.
The required pathway depends on the equipment, damage mechanisms and inspection plan.
External visual inspection, NDT interpretation, corrosion assessment and remaining-life decisions may require different competencies.
Check the pressure boundary, nozzles, supports, saddles, skirts, attachments and connected piping.
A single unexplained UT value is weak evidence. Look for repeatable locations and trendable records.
Local pitting should not be hidden by an average thickness value.
Check set pressure, isolation arrangement, test status and discharge route.
Look for design calculations/drawings, material certificates, welding records, NDE reports and test certificates.
An old inspection certificate does not automatically cover later modifications.
Check actual process changes, not only the original datasheet.
A completed inspection is not enough if the defects remain open and unmanaged.
Record the main defect, missing evidence, person responsible or follow-up action. Keep this short—the detailed checklist is available when a deeper record is needed.
The detailed version adds evidence expectations, typical gaps, escalation triggers, attachment packs and source basis.
Open detailed checklistIt helps identify obvious gaps and uncertain items. It does not replace the applicable Standard, manufacturer requirements, competent-person inspection, engineering assessment or site risk process.